Electrical Compliance

Electrical Safety Compliance Services in Pakistan, Saudi Arabia & GCC | FANCO
Electrical Engineering · Safety · Compliance

Electrical Safety Compliance

Identify electrical safety gaps, review installation and operating practices, and receive a practical, prioritised action plan to help protect people, assets and production.

Industrial electrical compliance support for facilities in Pakistan, Saudi Arabia and the GCC.

Compliance that works in the real world

Turn electrical safety requirements into practical action.

FANCO Industrial Solutions reviews electrical safety management, normal operating conditions, installation practices, engineering documentation and relevant code requirements. Our assessment helps facility teams understand where current practices or records may fall short and what should be addressed first.

Each engagement is scoped around the facility, applicable jurisdiction, client requirements, available drawings and the agreed assessment boundaries. Findings are documented with supporting observations and recommendations for corrective action.

Codes, standards & guidance

Electrical compliance standards and their scope

The applicable editions and legal status are confirmed for each project. The following standards are common reference points for electrical safety compliance reviews.

NFPA 70 · NEC

National Electrical Code

Addresses safe electrical design, installation and inspection of electrical systems, wiring methods, overcurrent protection, grounding and bonding, equipment and special occupancies where applicable.

Use: installation and code compliance review where adopted by the authority having jurisdiction or specified by the client.
NFPA 70E

Electrical Safety in the Workplace

Focuses on work practices for protection from electrical hazards, including risk assessment, electrically safe work conditions, energized work controls, approach boundaries and PPE selection.

Use: electrical safety management, work permits, SOPs and energized work process review.
IEC 60364 SERIES

Low-Voltage Electrical Installations

Sets principles and requirements for low-voltage installations, including protection against electric shock, thermal effects, overcurrent, wiring systems, earthing and verification.

Use: installation design and condition reviews where the IEC framework is applicable.
IEC 60204-1

Safety of Machinery — Electrical Equipment

Addresses electrical, electronic and programmable electronic equipment of machines, including supply isolation, protection, bonding, control circuits and technical documentation.

Use: machinery electrical safety and machine-related installation reviews.
IEC 61439 SERIES

Low-Voltage Switchgear Assemblies

Requirements for low-voltage switchgear and controlgear assemblies, including assembly characteristics, design verification and routine verification within the relevant parts.

Use: review of assembly documentation, ratings, verification evidence and installation conditions.
IEC 60947 SERIES

Low-Voltage Switchgear & Controlgear

Covers product requirements for low-voltage switching and control devices, such as circuit-breakers, switches, contactors and related equipment.

Use: review of device suitability, ratings and supporting equipment documentation.
IEEE 1584

Arc-Flash Hazard Calculations

Provides calculation models for estimating incident thermal energy and arc-flash boundaries for defined three-phase AC systems and conditions. It is not, by itself, a full electrical safety programme.

Use: arc-flash study review or project scoping; study inputs and exclusions must be checked carefully.
IEEE 3007.3

Electrical Safety in Industrial & Commercial Power Systems

Provides recommended practices and guidance for electrical safety programmes in industrial and commercial power systems.

Use: supporting guidance for electrical safety programme and management reviews, where specified.
LOCAL LAW & CLIENT RULES

Jurisdictional and Site Requirements

Local electrical regulations, authority requirements, utility conditions, client engineering standards and site HSE procedures may impose additional or different obligations.

Use: establish the compliance basis for Pakistan, Saudi Arabia or the relevant GCC jurisdiction.
Important: Standards are copyrighted and periodically revised. The project compliance matrix should identify the applicable edition, amendments, local legal requirements and authority having jurisdiction. A desktop review or site assessment does not automatically constitute statutory certification, a product conformity assessment or a guarantee of compliance.
Our services portfolio

Electrical safety compliance assessment services

FANCO can tailor the review to the facility’s risk profile, electrical system boundaries, available records and client scope of work.

01 / MANAGEMENT

Electrical Safety Management Review

Review responsibilities, safety governance, training and competency records, risk controls, incident learning and programme implementation.

02 / OPERATIONS

Normal Operating Condition Assessment

Review whether equipment condition, access, guarding, covers, labels, operating procedures and work conditions support safe normal operation.

03 / PROCEDURES

Normal Operating Checklist & SOP Review

Check operating checklists, isolation steps, abnormal-condition response, inspection records, role clarity and controlled document availability.

04 / ENERGIZED WORK

Energized Work Process Review

Review justification and authorisation, risk assessment, permits, boundaries, qualified-person controls, PPE requirements and emergency arrangements.

05 / DESIGN

Electrical Design & Code Compliance Review

Review available single-line diagrams, load and protection information, earthing philosophy, equipment ratings and specified design criteria.

06 / INSTALLATION

Electrical Installation Assessment

Site observations of panels, switchgear, cable routing, identification, access, enclosures, earthing/bonding and visible installation issues.

07 / DOCUMENTATION

Engineering Documentation & Sign-Off Review

Review drawing status, approvals, inspection and test records, change control, equipment data, handover records and required sign-offs.

08 / CODE REVIEW

Code Compliance Review

Build a requirements matrix and assess available evidence against agreed standards, local requirements and client specifications.

09 / SITE REVIEW

Site Walk-Through & Gap Assessment

Document observed deficiencies, potential risks, missing evidence and improvement opportunities, then prioritise recommendations.

Scope of work

Core assessment checklist

The final checklist is adapted to the facility and agreed scope. Typical review areas include:

✓Electrical Safety Management ReviewGovernance, responsibilities, procedures, competency and safety records.
✓Normal Operating Condition AssessmentVisible condition, safe access, covers, barriers, labels and operating environment.
✓Normal Operating Condition Checklist / SOPCompleteness, practical usability, approval status and review cycle.
✓Energized Work Process ReviewAuthorisation, risk controls, permits, qualified persons and PPE process.
✓Electrical Design & Code Compliance ReviewDrawings, ratings, protection concepts, earthing and design basis.
✓Electrical InstallationSite observations of panels, switchgear, cables, enclosures and identification.
✓Engineering Documentation & Sign-Off ReviewDrawings, test records, approvals, handover documents and change history.
✓Code Compliance ReviewAssessment against the agreed code basis and applicable local requirements.
✓Site Walk-ThroughStructured visual inspection and evidence collection with site representatives.
✓Gap AssessmentDocumented gaps, risk-based priorities, responsible actions and recommendations.
Our work methodology

From client data collection to a practical compliance report

A structured process makes findings traceable and recommendations easier to plan, assign and close.

Client Data Collection

Agree the scope and compliance basis; collect available single-line diagrams, layouts, equipment lists, protection settings, procedures, risk assessments, test reports and prior findings.

Site Visit & Walk-Through

Coordinate access and safety induction, interview relevant personnel, review selected equipment and verify available information through safe, agreed observations.

Engineering Review & Gap Analysis

Compare evidence with the agreed requirements, record observations, identify missing documentation and assess the significance of each finding.

Report & Recommendations

Issue a structured report with findings, evidence, applicable references where confirmed, priority, recommended corrective action and suggested follow-up.

Compliance Gap RegisterFinding reference, location, evidence, requirement and gap description.
Prioritised Action PlanRisk-informed priorities, recommended actions and suggested ownership.
Management SummaryKey risks, recurring issues, documentation gaps and next-step recommendations.
Safe-work boundary: Site activities are planned with the client’s permit, access and HSE requirements. The assessment is not permission to perform live electrical work. Intrusive testing, switching, measurements, shutdowns, calculations or formal certification are included only when specifically agreed and performed by appropriately competent personnel using suitable procedures and equipment.
What you can expect

Clear findings. Better-informed decisions.

Electrical Compliance Safety Report

Structured findings, compliance gaps, supporting observations and prioritised recommendations for corrective action.

Switchgear & Electrical Installation Review

Practical assessment of accessible electrical equipment, installation condition, identification, documentation and safe-work controls.

Talk to FANCO

Plan your electrical safety compliance assessment

Contact FANCO Industrial Solutions to discuss your facility, applicable standards, documentation available, site requirements and expected deliverables. We support industrial clients in Lahore, Karachi, Islamabad, Sadiqabad and other locations across Pakistan, as well as projects in Saudi Arabia and the wider GCC, subject to agreed scope and site access.